United Kingdom
Catalog   /   Small Appliances   /   Kitchen   /   Yoghurt / Ice Cream Makers

Comparison Silver Crest SECM 12 C7 vs UNOLD 48855

Add to comparison
Silver Crest SECM 12 C7
UNOLD 48855
Silver Crest SECM 12 C7UNOLD 48855
Outdated Product
from £69.05 
Expecting restock
TOP sellers
Typeice cream makerice cream maker
Ice cream maker operating modeautoauto
Total volume1 L1.5 L
Number of glasses1 bowl1 bowl
Specs
Yoghurt container materialglass
Shutdown timerdigital
General
Display
Power12 W12 W
Cable length1.5 m1.1 m
Dimensions203х230х241 mm219x219x255 mm
Weight2.36 kg3.2 kg
Added to E-Catalogseptember 2022march 2021

Total volume

The total volume of the device allows you to estimate how much product can be prepared in it at a time. In ice cream makers and yogurt makers with a bowl for cottage cheese, the volume is determined by the capacity of this bowl. And if there are several working glasses, the total volume is equal to the sum of all the containers.

Yoghurt container material

Yoghurt containers are usually made of glass or plastic. Glass cups are more fragile and heavier than plastic ones; on the other hand, glass is less sensitive to intensive washing, more resistant to overheating, and is considered a more "neutral" material, as it does not tend to release foreign substances (although modern food-grade plastics also meet this requirement).

Shutdown timer

The shut-off timer automatically switches off the device after the time required to prepare yogurt or ice cream has elapsed. Thus, you can avoid worrying about confusing the shut-off time and “overcooking” or “undercooking” the product. It is important to remember that it is advisable to immediately place the finished yogurt or ice cream in the refrigerator, so the presence of a shut-off timer does not eliminate the need to pay significant attention to the preparation process.

Display

The display makes the device easier to operate, making it more visual. The device screen can display the selected cooking program, the time remaining until the end of the process, information about the delayed start and other similar parameters.