PWM Speed Controller 4Pin PWM Fan Governor USB TYPE-C Power Supply- A
![]() |
Buy PWM Speed Controller 4Pin PWM Fan Governor USB TYPE-C Power Supply- A
When you make a purchase through links on our site, we may receive a affiliate commission.
PWM Speed Controller 4Pin PWM Fan Governor USB TYPE-C Power Supply- A | £8.51 | ||||
Features:Designedfor12V4-wirePWMfan/pump.Built-inDC-DCboostercircuit.
The product description is generated based on data from online stores. Before purchasing be sure to verify all information directly with the seller.

How to choose a water cooling systemBasic criteria for choosing a water cooling system for stable and safe operation of gaming PCs

How to properly build a PC yourself?Quick course on building computers of varying levels of complexity for beginners and amateurs
How to place an order?How to add store?
Remember that the online store is responsible for the accuracy of information regarding price, warranty, and delivery!
We recommendCompare using chart →












